FEED and ITB package, Assistance to selection of EPC Contractor and Owner's Engineer assignment during EPC Contract (detailed design and site supervision).
2008 - 2011
Portugal
Mundra LNG terminal
Site selection, detailed feasibility study, pre-FEED studies and FEED.
2008 - 2010
India
Gioia Tauro - Medgas LNG terminal
Pre-FEED phase with conceptual design and cost estimate at ± 25 %. Front End Engineering and Design (FEED) with cost estimate at ± 10 %. Specification of EPC scope and procedures and ITT package.
The assignment covers the whole terminal except pipe-in-pipe cryogenic lines.
2008 - 2010
Italy
Mejillones LNG terminal (Norte Grande Chili)
FEED study and Owner's Engineering services for a new LNG import terminal in Northern Chile.
The project consists in a on-shore vaporization system with a ship used as floating storage (=fast track solution) and in a classic LNG tank and ancillaries (=long term solution).
2006 - 2010
Chile
Extension du terminal GNL
Mission d’«owner’s engineer» comprenant la gestion du contrat et le suivi de toutes les activités de conception et de construction pour l’extension du terminal GNL de Fluxys à Zeebrugge, avec un 4e réservoir de stockage de GNL (capacité de 140 000 m³) et les installations supplémentaires pour la regazéification et l’acheminement du gaz dans le réseau de transport.
2005 - 2009
Belgium
Triton LNG FSRU
Assistance to Owner for project management and FEED supervision.
2008 - 2009
Italy
Trinidad liquefaction terminal
Expertise and Owner's Engineering assignments for LNG tank overhaul.
2009 - 2009
Trinidad and Tobago
Fos Tonkin LNG terminal
Feasibility study of the fourth tank.
Terminal overall renovation strategic study (feasibility stage).
2008 - 2009
France
Hazira LNG terminal debottlenecking
Assistance to Owner for terminal expansion studies - Framework agreement for Design and Engineering.
2007 - 2009
India
LNG terminal in Antifer- Le Havre
Full Owner's Engineer assignment covering: Pre-FEED review and optimisation of regasification system, Assistance to Public Debate, study of various technical solutions (GBS, reclaimed area,…), complete FEED.
2007 - 2009
France
Porto Empedocle LNG terminal
FEED for a new 8 bcm/a LNG terminal, including shipping study, marine access and operation, optimisation studies and simulation reports, EPC bid packing, EPC cost and schedule estimations, seismic study.
Owner's Engineering for clarification to tenderers and EPC contractor selection.
2006 - 2009
Italy
Priolo Gargallo LNG terminal - Sicily
Pre-FEED and FEED for a new receiving LNG terminal in Sicily including conceptual assessment and validation of pre-FEED definition, Front End Engineering and Design (FEED), specification of EPC scope and procedures.
2006 - 2009
Italy
LNG terminal extension at Zeebrugge
Feasibility study of increase of send out capacity of the terminal.
Technical feasibility of the installation of the two open rack vaporizers.
Pre-feasibility of a second extension with new jetty, new tanks and vaporisation.
2008 - 2008
Belgium
Mejillones North Chile LNG terminal
Delivery of design of BOG (Boil-off Gas) recondenser for EPC contractor.
2008 - 2008
Chile
Cabrillo Port LNG FSRU
Technical assistance for the development of a FSRU (Floating Storage and Regasification Unit) LNG terminal in Port Cabrillo.
2006 - 2006
United States of America
Mugardos LNG Terminal at La Coruña
Complete EPC turnkey project including Authority Engineering for a 5.2 bcm/y import terminal, with unloading jetty, 2 LNG storage tanks of 150.000 m³, a LNG truck loading station and natural gas distribution system to the local grid at 80 barg.
2003 - 2006
Spain
Snøhvit LNG liquefaction terminal
Complete mission for engineering, procurement, construction and commissioning of a loading jetty, 2 LNG storage tanks (2 x 125,000 m³), 1 LPG storage tank (45,000 m³), 1 condensate storage tank (75,000 m³) (for a 5.8 bcm/a export terminal).
2002 - 2006
Norway
Murgados - La Coruña LNG terminal
Complete mission for engineering, procurement, construction and commissioning including Authority Engineering for a 5.2 bcm/a import terminal, with unloading jetty, 2 LNG storage tanks (2 x 150,000 m³), a LNG truck loading station and natural gas distribution system to the local grid at 80 barg.
2003 - 2006
Spain
Terminal GNL de Sines
Conception de la construction du terminal récepteur de GNL de Transgas Atlantico à Sines, comprenant deux réservoirs de stockage de GNL à rétention totale d’une capacité de 120 000 m³ chacun, des installations de déchargement de GNL dotées notamment d’un musoir, d’une installation de déchargement et d’une passerelle pour bateaux permettant l’accès de bâtiments allant jusqu’à 165 000 m³.